Installing rebar of Machinery center 2's PIT floor wall. Completed lean concrete of waste water treatment center.
2205/2019
Weekly construction updated May 21, 2019

Installing rebar and formwork of 1st floor wall and 2nd floor slab of MB. Installing rebar and formwork of 1st floor wall of RB1. Installing rebar and formwork of 2nd floor slab of RB2&3. Continues casting concrete Utility tunnel between buildings.